Everything posted by Mike North
-
Can I have a fire corridor inside my building?
it is possible, however you may then fall foul of the 1.8m rule for distance between for your final exits and need FD30 doors.
-
Buying a new flat without a FRA
For a new build, an FRA is not required until occupation, it should conform to BR and an FRA should reflect that. At the point of occupation, you should get the Regulation 38 information. As for an FRA personally as most issues arise from the occupants use of the flat (over loading sockets, not keeping fire exits clear etc) I would be reticent about conducting one until the flat has been occupied for 4 weeks.
-
Escape Route Capacity
I think you will find your limiting factor will be the the capacity of the stairwell.
-
Face Damage
If the core of the door is damaged, its time for a new one.
-
intumescent strip from previous up grade
I doubt that the doors are installed to there certificates, intumescent strips installed in the door, or frame. You cannot rebate the door for strips and then not fit them.
-
Mr
Without reading the FRA, the fire doors can swing in either direction if there is less than 60 people likely to use them in the event of escape, otherwise they must swing in the direction of escape. The “based on my doors being held open” needs clarification, I take it as reading the exit width can accommodate 100 people as long as their door is not obstructed. So basically, as long as the door swings in the direction of escape you can have 100 people exiting through the door, if the doors swing in against the direction of escape, then you are limited to 60. You still need to discount your largest exit
-
Can external escape routes go past windows?
The door sounds like it should be FD30S, as long as the door and glazing conforms to the standard then yes.
-
Fire Doors in HMO
I think the pertinent bit is where the fire detection system is restricted to the escape route, I do not think that you will get BC sign off if there is no detection in the kitchens
-
Building Persons on Site Register
I would keep the sign in/out for visitors and any lone workers. For everyone else, they should be responsible enough to inform someone when they leave site
-
New office walls
Have a look at inner rooms BR 2019 para 2.11, it may bring the cost down.
-
Protected escape route in ***
If it is a single dwelling, two floors then there is no problem
-
When selling flat, do I need a fire risk assessment?
BS 9991 only applies to new builds and material alterations to existing buildings; it is not retrospective. Would he insist on the installation of AOVs in the Tower of London?
-
Fire Safety in a hybrid office
Ensure that your rota includes a fire marshal is always present or make everyone a fire marshal
-
cooking in a classroom
Probably yes, however you need a risk assessment and probably a change of use
-
Keypad on Library Building Fire Door
In the event of an activation of the fire alarm, does the lock fail safe? If not then you have a potential dead-end situation which would mean you need to protect the corridor both sides of the door. Is the door actually a fire door? It only has 2 hinges which appear to be leaking oil.
-
Paint in new build
The brick, paint and plaster will be sufficient fire resistance for the corridor, unless, the school starts hanging paper pictures along the length of corridor
-
Acoustic curtain blocking fire exit in new build venue
BR 2019 Final exits 5.20 The width of a final exit should be at least the same as the minimum required width of the escape route it serves. 5.21 People should be able to rapidly leave the area around the building. Direct access to a street, passageway, walkway or open space should be available. The route away from the building should comply with the following. a. Be well defined. b. If necessary, have suitable guarding. 5.22 Final exits should not present a barrier for disabled people. Where the route to a final exit does not include stairs, a level threshold and, where necessary, a ramp should be provided. 5.23 Final exit locations should be clearly visible and recognisable. 5.24 Final exits should avoid outlets of basement smoke vents and openings to transformer chambers, refuse chambers, boiler rooms and similar risks.
-
Refurb
Building is a large store, the doors are cross corridor doors. The building is to under go an internal refurb.
-
Roller Shutter Fire Exit
BS 9999:2017 14.2 Acceptable means of escape i. wicket doors and gates (except from high risk areas), provided that: 1. they are not intended to be used by members of the public; 2. not more than 10 persons are expected to use them in an emergency; 3. they provide an opening at least 500 mm wide, with the top of the opening not less than 1.5 m above the floor level and the bottom of the opening not more than 250 mm above the floor level; 14.3 Generally unacceptable means of escape e. security grilles and shutters (roller, folding or sliding), loading doors, goods doors, sliding doors and up-and-over doors, unless they are capable of being easily and quickly opened. If power-operated they should: 1. be provided with a fail-safe system for opening if either the mains supply and/or any alternative power supply fails; 2. be capable of being easily and quickly opened manually;
-
Refurb
We are currently refurbing a single story building which has 3 corridors approximately 35m in length running in parallel between the final exits. We are installing FD30S doors as approximately the midpoint of each corridor. The issue is that at the midpoint is another corridor that connects the three corridors but is not connected to a final exit (basically |-|-|) we can either put a door at the midpoint of each (2 doors) or at the end (3 doors). Does anyone have any suggestions or an alternative, currently the walls are not full height and so require fire stopping.
-
Fire doors in a domestic 3 storey house
Reading the building regulations, it is quite clear that these fully cover new buildings. They also cover material alteration and material change of use. New builds and existing buildings will have to meet the requirements of the regulations that where in force at the time of construction/design. There is no part of the regulation that requires the building to be brought up to the latest regulation. For refurbished/altered buildings, we have to rely on SI 2214:2010 (building Regs) paragraphs 3, 4 and 6, for paragraph 3 the requirements for works comes under paragraph 4, the last paragraph of which in this section states that, where it did not comply before the works there is no requirement for it to comply as long as it is no worse than before the works started. In summary, if an item is to the current regulations, it must be maintained to it, there is no requirement to bring any item that does not meet the current regulations to the current regulations. If an item is replacement this then becomes a material alteration and will require installing to the current regulations, there will be no expectation within the regulations to bring the remainder of the building up to the latest regulation.
-
Does a Final Exit need door closer?
That would create one hell of a vacuum making the door all but impossible to open
-
Reinstatement to penetrations cut in Fire Batt
Obviously remove the existing bat, install a suitable framework, then install the hatch, then make good with bat correctly around the hatch. All the above using 3rd party accredited materials and contractors.
-
Reinstatement to penetrations cut in Fire Batt
I would rip outs the piece of bat that has the hole in it and renew it with a fire rated hatch in case you need access again
-
Fire Safety - possible issues
Although it does not look nice, the ceiling tiles are not there for fire protection merely for decoration the fire stopping is above the sprinkler head, the black intumescent that can be seen in the second image appears to be adequate. Unfortunately, the occupation has happened before practical completion, shouldn’t happen but it does, as long as a clear thoroughfare is kept it is not an issue. As long as someone in close proximity is in control of the of the door again, I do not see it as an issue.