February 9, 20215 yr comment_19227 Where do you draw the conclusion if a property needs separate FRA’s? For example residential blocks not connected by MOE, own ingress and egress but managed and connected by the same AFD. Some clients insist on separate FRA’s whilst some want one to cover all for overall reference and autonomy. Thoughts greatly received. Report
February 9, 20215 yr comment_19235 There is no hard and fast answer, it's a case by case thing. All being on one alarm system leans towards one report, but it could equally be done as three. Really massive multiple building sites need splitting but in smaller cases it's on the merits of each case. Report
February 10, 20215 yr Author comment_19244 Appreciate the reply. You’ve confirmed my thoughts. Thanks. Report
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.