Guest IAHP Posted February 17, 2022 Report Share Posted February 17, 2022 Can anyone tell me if a stud partition wall, timber with 12.5mm plasterboard either side, built to separate the area above offices/stores from a workshop, meets fire safety regulations as it is or does it need to be clad/finished before it meets regulations. I believe the plasterboard itself is 30 min fire resistant. Thanks in advance Quote Link to comment Share on other sites More sharing options...
AnthonyB Posted February 22, 2022 Report Share Posted February 22, 2022 Normally a stud wall with 12.5mm plasterboard either side, if correctly built and fitted would achieve 30 minutes. Usually edges needs to be taped and sealed or a plaster skim applied as well Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.