Jump to content

Concrete Ceiling


Dave501

Recommended Posts

Hi,

Currently there is condensation coming through concrete ceiling on top floor flat which is on the second floor. To eliminate condensation to the ceiling I am going to stud it out with 50mm x 50mm timber and then use 50mm thick Celotex insulation between the studs to fill the void and then plasterboard. Some one asked me to thermal board straight on to the studs but I was very concerned about the weight. Would this comply to fire regs by using the celotex insulation and plasterboarded over the top as I know it is fire resistant?

Link to comment
Share on other sites

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...