Jump to content

Aldo

Members
  • Posts

    3
  • Joined

  • Last visited

Profile Information

  • Gender
    Male
  • Location
    London

Aldo's Achievements

  1. Doc B2 internal spread of fire https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/441669/BR_PDF_AD_B2_2013.pdf
  2. The guidance is (as always) a bit fluffy. I have uncovered for a client, missing putty pads on MF/PB walls that form a 30min escape corridor. This is a no brainer - they need putting in. But the investigative report shows no putty pads where boxes are on external walls and party walls that are shown as 60min - these walls are 12.5 (grey) PB on dabs on 100mm concrete block. FYI the fire line of escape route goes through ceiling void to concrete block and beam floor. My thoughts are there is low risk of spread of flame or smoke in void between PB and blockwork as no fuel (assuming solid line of dot/dab along parameters.
  3. Where walls are dot n dab on masonry party and external walls and not on the fire line escape route are intumescent "putty" pads required? Thanks for any advice.
×
×
  • Create New...