Daveb Posted August 30 Report Posted August 30 Hi I am living in a rental bungalow 12 month tenure. I am concerned the garage which is joined to side of the building and extends beyond the rear elevation of the building has been sectioned internally into a rear utility room with an external door. A Washing Machine and tumble dryer have been fitted with services through the batton and plasterboard only on the utility side. The garage has a CU for the bungalow on the bungalow wall. There is an electric roller door on the front of the garage. There is a small metal non fire trapdoor through the deviding ( installed in 2020 and signed) wall to get through in the event of the garage door being closed if the C U trips I am 19 stone and can't get through the trapdoor any observations? Should this division between the Garage and the utility room be 30 min fire construction? ⁰ Quote
Recommended Posts
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.