Jump to content

Robert steel

Members
  • Posts

    2
  • Joined

  • Last visited

Posts posted by Robert steel

  1. Hi

    A residential block of flats which has connected halls and is ground to sixth floor.

    If riser cupboards on a communal hall/ exit routes has large Breaches on the floor and ceiling from grd to sixth, but has FD30s fitted also an AOV within the hall ways and a fire dectection system installed, is it recommended that all breaches are suitable sealed up or left as it is???

     

×
×
  • Create New...